It looks like a Beckson deck plate was installed inside the anchor locker where the anchor locker drain pipe was originally.
My guess is the PO needed access to the space below for some reason, or possibly the drain pipe or the anchor locker deck was compromised. Drop a 35# CQR, crunch!
A ventilation cowel would be ineffective in a anchor locker as indicated
#174, 38th consecutive seasons