Yes, long winter.....followed by a long refit!
After completing a long list of items which included the following she is ready for launch:
Mast rewiring w/new LED Tricolor/Anchor Light, LED Masthead Light, LED Spreader Lights.
Mast Painted
New Aluminum "Terminator T800 Grade" Mast Step
New Windex (of course)
New Halyards
New Raymarine Electronics: Speed/Depth/Wind
New 12V primary Blue Sea Single Switch System w/ NEW AGM Batteries
New Stainless Steel Shaft/Cutlass Bearing/PSS Dripless Shaft Seal
New Exhaust Elbow
New Water Temp Gauge/sender
New Low Oil pressure 90db Alarm w/Red Led light in Cockpit
New High Temp 90db Alarm w/Blue Led light in Cockpit
New Stainless Exhaust Elbow and Hose
New Composting Head
The rest we can complete on the mooring....
Finish the Origo 6000 Stove/Oven Installation
Finish the Cushion re-upholstery
Re-bed the windows
Launch day is this Friday: 2014-06-06
Maybe I can relax now after 45 hour work weeks and 16-20 hour refit weekends! lol
"Sub" Ed