1
Ports & Hatches / Re: Another Ports Saga
« on: June 19, 2021, 10:35:57 AM »
The only thing that I can think of, and I'm sure you've thought of it, is to put the gasket (glazing) in the bezel first and then slide (?) the glass in the bezel/gasket half, then try to put the other bezel half on. Probably not a useful suggestion but your experience with this project has struck a nerve.
Each time I tackle an issue it seems pretty straight forward and my intention is to finish that project and then move on to another. This has not been my experience. : )
My original to-do list (partial) from 2019:
1. "Fix leaks" (haha) - Started with the hatches but in doing that noticed about 20% of the headliner was rotted
2. "Replace rotted teak and holly cabin sole pieces (v-birth and pc behind mast)" - almost done with that after a year
4. "Address the undersides" - Bead blast, barrier and finish reveled a questionable depth transducer bed - add that to the list along with the other Datamarine electronics
5. "Address rigging, mast, mast electrical (mast step is good)" - My thought: "I wont have to do a thing, my rigging guy will do everything." Add chain plates - since I have to re-bed those might as well re-bed other topside hardware. The area where the mast comes through the deck has cracks in gel coat and should be repaired before re-steppping...
I had to get that off my chest. : ) Anyway, Blue Sky is still on the hard this year. Hope to launch her next month. Despite this, I love working on her and seeing the fruit of my (and others) labor.
Each time I tackle an issue it seems pretty straight forward and my intention is to finish that project and then move on to another. This has not been my experience. : )
My original to-do list (partial) from 2019:
1. "Fix leaks" (haha) - Started with the hatches but in doing that noticed about 20% of the headliner was rotted
2. "Replace rotted teak and holly cabin sole pieces (v-birth and pc behind mast)" - almost done with that after a year
4. "Address the undersides" - Bead blast, barrier and finish reveled a questionable depth transducer bed - add that to the list along with the other Datamarine electronics
5. "Address rigging, mast, mast electrical (mast step is good)" - My thought: "I wont have to do a thing, my rigging guy will do everything." Add chain plates - since I have to re-bed those might as well re-bed other topside hardware. The area where the mast comes through the deck has cracks in gel coat and should be repaired before re-steppping...
I had to get that off my chest. : ) Anyway, Blue Sky is still on the hard this year. Hope to launch her next month. Despite this, I love working on her and seeing the fruit of my (and others) labor.